“Unico” CJSC organized a site visit for office staff

Thus, the employees got acquainted with the work done in the ongoing hotel project in Baku. The project manager provided detailed information to the site visitors about the external facade cladding works of the building, the works done in connection with the design and implementation of facade cladding lighting works.

It should be noted that “Unico” CJSC regularly organizes site visits for office employees, which supports employees to become more familiar with projects and works more effectively.

The construction works of our high school project for 960 pupils in Karabakh is continuing successfully

Project: Agdam city secondary school No. 1 for 960 pupils
Our role in the project: General Contractor
Performed works: demolition, excavation, reinforced concrete and metal construction, facade, internal finishing, external communication lines (mechanical, electrical and plumbing), landscape design – amenity renovation.
Project duration: 1 year
Construction area: 4611.8 m2
Total area: 2.32 ha
Height: 16 m
Number of floors: 3

With great pleasure we would like to announce that we have successfully completed another school construction project which we are the main contractor

This project is the construction project of Saray settlement No. 2 secondary school named after A. Muzaffarov. The construction of the mentioned new school building for 2000 students had started by “Unico” CJSC in January 2021. The area of the school, built according to the most modern international standards, is 21,000 square meters. The newly built 4-storey school has 70 classrooms, 6 laboratories, 5 informatic rooms, a pre-conscript military training room, music, visual arts, technology rooms, as well as a library, an auditorium, two gymnasiums, and a dining hall. The building, which is equipped with the most modern equipment, has created all conditions for the organization of high-quality education. The educational center will also have two preschool rooms. A STEAM center has also been created in the educational institution. The STEAM center is equipped with an electronic board, a computer, a 3D printer, relevant educational devices, electronic components, and stationery. There is also an engineering workshop, a hall for flying drones, training and robotics.

We are proud of that we have made every effort to ensure that our students, who are the future of Azerbaijan, receive a high-level education, and we send our gratitude to the Ministry of Science and Education of the Republic of Azerbaijan for entrusting us with this work.

We thank everyone who contributed to the project and wish them success in their next projects!

The construction works of our high school project for 960 pupils in Karabakh is continuing successfully

Project: Agdam city secondary school No. 1 for 960 pupils
Our role in the project: General Contractor
Performed works: demolition, excavation, reinforced concrete and metal construction, facade, internal finishing, external communication lines (mechanical, electrical and plumbing), landscape design – amenity renovation.
Project duration: 1 year
Construction area: 4611.8 m2
Total area: 2.32 ha
Height: 16 m
Number of floors: 3